The Barn Hayes Farm Mannings Lane Hoole Village Chester CH2 4ES
15th October 2025
Demolition of existing stable block and store and erection of front, side and rear extensions with front glazed gables for additional living accommodation to include bedrooms, gym and car port.
Hero Equestrian Centre Oak Bank Lane Hoole Village Chester CH2 4ER
11th September 2025
Notification of campsite to be opened between July and August 2026 under the 60 day rule
Peter Pan 9 Mannings Lane Hoole Village Chester CH2 4EU
30th August 2025
Single storey rear extension, first floor front and rear dormers and ground floor front elevation alterations.
Peter Pan 9 Mannings Lane Hoole Village Chester CH2 4EU
9th June 2025
Single storey rear extension (variation of 23/01301/FUL)
22 Long Lane Hoole Village Chester CH2 2PD
31st January 2025
Construction of new/replacement garden wall/ fence /gates
The Royal Oak Toby Carvery Warrington Road Mickle Trafford Chester CH2 4EX
22nd October 2024
Installation of roof mounted 46.2kW solar PV system comprising of 105 x Canadian Solar 440w modules
The Hammond School Mannings Lane Hoole Village Chester CH2 4ES
15th January 2024
Erection of Portocabin (retrospective).
Holly Bank Farm Mannings Lane Hoole Village Chester CH2 4ES
21st December 2023
Non material amendment to planning permission 21/02999/FUL for additional two ground floor windows to the side elevation, new boundary treatment and change of rear window finish colour.
Hayes Farm Mannings Lane Hoole Village Chester Cheshire CH2 4ES
9th May 2022
Single storey side extension to an existing storage shed and garage to create additional storage space
Holly Bank Farm Hoole Bank Chester Cheshire CH2 4ES
13th July 2021
Two storey side extension
The Lodge Oak Bank Lane Hoole Village Chester Cheshire CH2 4ER